Adani News Today | Adani Group To Manufacture India’s Longest 91.2-Metre Wind Turbine Blade

Adani New Industries Limited (ANIL), which houses the Adani Group’s renewable manufacturing businesses, is all set to manufacture 91.2-metre onshore wind turbine blades at its Mudra facility in Gujarat. The blades are said to be the longest ones produced in the country. The blades will be deployed on next-generation turbines that have been designed to improve energy output, particularly at low and medium-wind sites.

About The Author

  • Related Posts

    Mumbai News | Harassed In Mumbai, But India Remains A Favourite, Says Travel Vlogger Ines Faria

    A foreign travel vlogger who alleged harassment in Mumbai has thanked the police for their swift response and described the episode as a “one-off incident”, saying it has not changed…

    Israel Vs Iran War | Khamenei Death News: खामेनेई की मौत पर ईरानी सेना का बयान | Breaking News

    Israel Vs Iran War | Khamenei Death News: खामेनेई की मौत पर ईरानी सेना का बयान | Breaking News Khamenei Death News: ईरान के सुप्रीम लीडर अयातुल्लाह खामनेई इजरायली हमले…

    Leave a Reply

    Your email address will not be published. Required fields are marked *

    You Missed

    AI-led job concerns or price fatigue? Why some Bengaluru techies are hitting the pause button on property investment

    • 1 views

    AI-led job concerns or price fatigue? Why some Bengaluru techies are hitting the pause button on property investment

    • 1 views

    AI-led job concerns or price fatigue? Why some Bengaluru techies are hitting the pause button on property investment

    • 1 views

    AI-led job concerns or price fatigue? Why some Bengaluru techies are hitting the pause button on property investment

    • 1 views

    AI-led job concerns or price fatigue? Why some Bengaluru techies are hitting the pause button on property investment

    • 1 views

    AI-led job concerns or price fatigue? Why some Bengaluru techies are hitting the pause button on property investment

    • 1 views